Author of the publication

Study on pi-Calculus Based Equipment Grid Service Chain Model.

, , and . NPC, volume 3779 of Lecture Notes in Computer Science, page 40-47. Springer, (2005)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

A Constraint Satisfaction Neural Network and Heuristic Combined Approach for Concurrent Activities Scheduling., and . J. Comput. Sci. Technol., 18 (2): 252-257 (2003)Scheduling approach for concurrent product development processes., and . Computers in Industry, 46 (2): 139-147 (2001)A two-stage hybrid particle swarm optimization algorithm for the stochastic job shop scheduling problem., , and . Knowl.-Based Syst., (2012)Generalized gradient projection neural networks for nonsmooth optimization problems., , and . SCIENCE CHINA Information Sciences, 53 (5): 990-1005 (2010)Reverse triple I method of fuzzy reasoning., and . Science in China Series F: Information Sciences, 45 (5): 344-364 (2002)Improved topic classification over maximum entropy model using k-norm based new objectives., , , and . INTERSPEECH, ISCA, (2006)Towards robust speech recognition in the telephony network environment - cellular and landline conditions., , and . EUROSPEECH, ISCA, (1999)A genetic algorithm for minimizing the makespan in the case of scheduling identical parallel machines., and . AI in Engineering, 13 (4): 399-403 (1999)A simulated annealing algorithm based on block properties for the job shop scheduling problem with total weighted tardinessobjective., and . Computers & OR, 38 (5): 854-867 (2011)Fairness in LOTOS., and . FORTE, volume C-2 of IFIP Transactions, page 543-558. North-Holland, (1991)