Author of the publication

Scheduling approach for concurrent product development processes.

, and . Computers in Industry, 46 (2): 139-147 (2001)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

A two-stage hybrid particle swarm optimization algorithm for the stochastic job shop scheduling problem., , and . Knowl.-Based Syst., (2012)Scheduling approach for concurrent product development processes., and . Computers in Industry, 46 (2): 139-147 (2001)A Constraint Satisfaction Neural Network and Heuristic Combined Approach for Concurrent Activities Scheduling., and . J. Comput. Sci. Technol., 18 (2): 252-257 (2003)Generalized gradient projection neural networks for nonsmooth optimization problems., , and . SCIENCE CHINA Information Sciences, 53 (5): 990-1005 (2010)Reverse triple I method of fuzzy reasoning., and . Science in China Series F: Information Sciences, 45 (5): 344-364 (2002)Third Parth Subsidy is Not Effective towards Improving the Trading Efficiency for Most E-Business Markets., , , and . APSCC, page 40-47. IEEE Computer Society, (2007)Fairness in LOTOS., and . FORTE, volume C-2 of IFIP Transactions, page 543-558. North-Holland, (1991)Solving a Multi-Level Capacitated Lot Sizing Problem with Random Demand via a Fix-and-Optimize heuristic., , and . CEC, page 2721-2728. IEEE, (2015)Qualification Evaluation in Virtual Organizations Based on Fuzzy Analytic Hierarchy Process., , , and . GCC, page 539-547. IEEE Computer Society, (2008)A genetic algorithm for minimizing the makespan in the case of scheduling identical parallel machines., and . AI in Engineering, 13 (4): 399-403 (1999)