Author of the publication

Minimizing the weighted number of tardy jobs on a single machine: Strongly correlated instances.

, , , and . Eur. J. Oper. Res., 298 (2): 413-424 (2022)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

No persons found for author name Sucha, Premysl
add a person with the name Sucha, Premysl
 

Other publications of authors with the same name

Alternative process plans in wire harnesses production., , and . ETFA, page 1-8. IEEE, (2010)Robust scheduling for manufacturing with energy consumption limits., , and . ETFA, page 1-8. IEEE, (2016)Algorithms for robust production scheduling with energy consumption limits., , and . CoRR, (2018)Solving the Resource Constrained Project Scheduling Problem Using the Parallel Tabu Search Designed for the CUDA Platform., , and . CoRR, (2017)Total Setup Time Minimisation in Production Scheduling with Alternatives., , and . HoloMAS, volume 10444 of Lecture Notes in Computer Science, page 11-23. Springer, (2017)Price of anarchy and price of stability in multi-agent project scheduling., , , and . Annals OR, 285 (1): 97-119 (2020)Scheduling of Iterative Algorithms with Matrix Operations for Efficient FPGA Design - Implementation of Finite Interval Constant Modulus Algorithm., , , and . VLSI Signal Processing, 46 (1): 35-53 (2007)Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources., and . Annals OR, 248 (1-2): 209-237 (2017)A cyclic scheduling problem with an undetermined number of parallel identical processors., and . Comp. Opt. and Appl., 48 (1): 71-90 (2011)Roster evaluation based on classifiers for the nurse rostering problem., , and . J. Heuristics, 22 (5): 667-697 (2016)