Author of the publication

A Multi-Objective Evolutionary Algorithm for Multi-Energy Allocation Problem Considering Production Changeover in the Integrated Iron and Steel Enterprise.

, , , and . IEEE Access, (2019)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

No persons found for author name Tang, Lixin
add a person with the name Tang, Lixin
 

Other publications of authors with the same name

A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex., and . European Journal of Operational Research, 182 (3): 1453-1468 (2007)Simultaneously scheduling multiple turns for steel color-coating production., and . European Journal of Operational Research, 198 (3): 715-725 (2009)An Improved Particle Swarm Optimization Algorithm for the Hybrid Flowshop Scheduling to Minimize Total Weighted Completion Time in Process Industry., and . IEEE Trans. Contr. Sys. Techn., 18 (6): 1303-1314 (2010)Solution method for the location planning problem of logistics park with variable capacity., , and . Computers & OR, 40 (1): 406-417 (2013)A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times., , and . Computers & OR, 37 (5): 960-969 (2010)A stochastic production planning problem with nonlinear cost., , and . Computers & OR, 39 (9): 1977-1987 (2012)An improved scatter search algorithm for the single machine total weighted tardiness scheduling problem with sequence-dependent setup times., and . Appl. Soft Comput., (2015)A new hybrid ant colony optimization algorithm for the vehicle routing problem., and . Pattern Recognition Letters, 30 (9): 848-855 (2009)A new ILS algorithm for parallel machine scheduling problems., and . J. Intelligent Manufacturing, 17 (5): 609-619 (2006)A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment., , and . J. Intelligent Manufacturing, 16 (3): 361-370 (2005)