Author of the publication

Uncertainty and sensitivity analysis for the seismic scenario classes in the 2008 performance assessment for the proposed high-level radioactive waste repository at Yucca Mountain, Nevada.

, , , , , , , , , , , , , , and . Rel. Eng. & Sys. Safety, (2014)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Characterization of stochastic uncertainty in the 1996 performance assessment for the Waste Isolation Pilot Plant., , and . Rel. Eng. & Sys. Safety, 69 (1-3): 167-189 (2000)The 1996 performance assessment for the Waste Isolation Pilot Plant., and . Rel. Eng. & Sys. Safety, 69 (1-3): 1-3 (2000)Expected dose for the nominal scenario class in the 2008 performance assessment for the proposed high-level radioactive waste repository at Yucca Mountain, Nevada., , and . Rel. Eng. & Sys. Safety, (2014)Extension of Latin hypercube samples with correlated variables., , and . Rel. Eng. & Sys. Safety, 93 (7): 1047-1059 (2008)Radionuclide transport in the vicinity of the repository and associated complementary cumulative distribution functions in the 1996 performance assessment for the Waste Isolation Pilot Plant., , , , , and . Rel. Eng. & Sys. Safety, 69 (1-3): 369-396 (2000)Probability of loss of assured safety in systems with multiple time-dependent failure modes: Representations with aleatory and epistemic uncertainty., , and . Rel. Eng. & Sys. Safety, (2014)Expected dose for the seismic scenario classes in the 2008 performance assessment for the proposed high-level radioactive waste repository at Yucca Mountain, Nevada., , , , and . Rel. Eng. & Sys. Safety, (2014)Direct releases to the surface and associated complementary cumulative distribution functions in the 1996 performance assessment for the Waste Isolation Pilot Plant: direct brine release., , , , , and . Rel. Eng. & Sys. Safety, 69 (1-3): 343-367 (2000)Alternative representations of epistemic uncertainty., and . Rel. Eng. & Sys. Safety, 85 (1-3): 1-10 (2004)Sensitivity analysis in conjunction with evidence theory representations of epistemic uncertainty., , , and . Rel. Eng. & Sys. Safety, 91 (10-11): 1414-1434 (2006)